Words used in ContractBill

A bill uses a lot of short words that the department knows by heart. This page says what each one means in a line, in the way ContractBill uses it, so you can check a sheet without asking anybody.

Checked against ContractBill on 12 October 2026

The words of the bill

WordWhat it means
RA BillThe bill for the work done so far. RA means running account. When the bill number has the word Final in it, it is the last bill of the work.
Schedule of WorkThe list of the items of your work, with their codes, quantities and rates.
Work OutlayThe amount for the work after the factor, the cost index, the MKT and Recovery items and the quoted percentage, rounded to the rupee.
Quoted %The percentage above or below the estimate that you quoted. It is in your award letter.
Cost indexA percentage added to the corrected total to bring the book rates up to today. It is printed in your tender papers.
FactorThe correction factor of your tender, a number like 0.973 that the book rates are multiplied by. It is also called the multiplying factor.
DSRThe Delhi Schedule of Rates, the rate book of CPWD. ContractBill has DSR 2023 and DSR 2016.
Appd.An approved item, billed at the rate the department approved. It takes the factor and the cost index like a DSR item.
NSA non schedule item, an item that is not in the rate book. It takes the factor and the cost index too.
MKTA market rate item. It stays at par, which means no factor and no cost index.
RecoveryOn the Schedule, an amount taken off the bill. It also stays at par.
Recovery tabThe security deposit, income tax, GST TDS and labour cess that the department keeps back, which give the Net Payable.
SayThe Grand total of the Schedule rounded to the whole rupee. It is the last line of the totals.
AbstractThe sheet that prices what was measured, and runs down to the Gross Amount Payable.
RERecord Entry, the sheet of your measurements. On screen it is the Measurements tab.
DeviationThe difference between what was sanctioned and what was actually done.
Part rateA lower rate paid now for work that is built but not finished, with the balance held back until it is.
MBMeasurement Book, where the measurements are recorded and signed.
AEAssistant Engineer.
JEJunior Engineer.
EEExecutive Engineer. The EE, the AE and the JE sign the sheets of the bill.
The Schedule page with one item for each of DSR, Appd., NS, MKT and Recovery in the Category column (the narrow box cuts the longer names short), and the totals ending in Say
The Schedule page of a sample tender. Most of these words are on this one screen.